ELECTRICITY
The
distribution of power in district Kurukshetra is looked after by the Uttar Haryana Bijli Vitran Nigam.
The district gets its power form 440 KV Sub-Station at Panipat and Jagadhari
through Bhakhra Beas Management Board for which a network of sub-station and
transmission have been established.
Sub-Stations
There are 2 no. 220KV S/Stn. , 5 no. 132KV S/Stn., 5 no.
66KV S/Stn. and 12 no. 33KV Sub-Stations in Kurukshetra District. The proposed
new S/Stn. and where augmentation is to be carried during the year 2000-2001
are as under.

i) New Sub-Stations
ii Augmentation at the
S/Stns.
HT/LT Lines
At present 3987 Kms. of 11KV lines are existing under
Kurukshetra district and it is estimated that 150 KMs. HT lines will be added
during this year. 7862 Kms. of LT lines are existing in Kuruksheta Distt. and
100 KMs LT lines are estimated to be added during this year.
1. Release of tubewell connections under Tatkal
Scheme
UHBVN has introduced a Tatkal Scheme wherein for cable connection
applicant was required to deposit Rs. 10000/- and for single pole connection
Rs. 20000/- 243 no. applicants have deposited for cable connections, out of
which 242 connections have been released. Similarly 236 applicants have
deposited for single pole connections, out of which 171 connections have been
released.
2. Remote Control Load Management Scheme
RCLM Scheme is being implemented on 2no. 11KV feeders i.e.
11KV Dhola Majra Feeder and 11KV Kishangarh Feeder at 220KV S/Stn. Shahabad.
Work of hte scheme of 11KV Dholamajra Feeder has been completed whereas work on
the 11KV Kishangarh feeder is under process. After the commissioning of the
scheme, the load on each T/F will be controlled from the S/Stn. This will
facilitate the switching on and off of the distribution T/Fs from the 220KV
S/Stn. itself. The various parameters of current, voltage and oil level of the
T/F will also be seen on the screen of the computer at the S/Stn.
3. Surcharge Waival Scheme
The Nigam has introduced surcharge waival scheme, according
to which all the domestic as well as AP consumers in the Distt. have been
authorised to remit their bills without paying the surcharge upto 30-11-2000.
This will facilitate in reducing the outstanding dues of the Nigams.
Office
Address:
Superintending Engineer,
Uttar Haryana Bijli Vitran Nigam
R.E.C.K. Campus, Kurukshetra
Phone No.: 01744 – 220956